Zone Isolation
Hydro Fracture Zone
isolation hydro fracturing is most commonly used in situation where a
lot of water is needed. Normally this would consist of municipal
wells, community wells and irrigation wells, however there are various
circumstances and areas of the country where zone isolation hydro
fracture is needed on domestic wells.
This hydro fracture process is by far the
most effective, with a success rate of over 99% and increased well
yields up to 20 gpm (Gallons per minute) and more this process
is second to none.
This process is normally repeated up to 10
times in a well, starting from the bottom of the well and working your
way out. It is far more expensive than a single packer hydro fracture
and takes much longer to perform (8-12 hours) but it will get you more
water than the single packer process.
|